NO. | Equipment | Model | Number | Motor(KW) | Total Motor(KW) |
A1 | Vibrating Feeder | MGD0940 | 1 | 2*3.7 | 7.4 |
A2 | Jaw Crusher | MJ80 | 1 | 75 | 75 |
A3 | Hopper Feeder | MGB1220 | 1 | 2*2.4 | 4.8 |
A4 | Cone Crusher | MC100Z | 1 | 90 | 90 |
A5 | Impact Crusher | MPF1214 | 1 | 132 | 132 |
A6 | Vibrating Screen | 3MK2160 | 1 | 30 | 30 |
A7 | Vibrating Screen | 2MK2160 | 1 | 22 | 22 |
Total | 361.2 |
Note: The calculation results in the above figure Medium Hard Rock 100T/H are based on typical working conditions. Since the actual working conditions vary widely, this result is only used as a reference for the recommended process.
Hard Rock: Hard Rock 100-200T/H with VSI Crusher Hard Rock 300T/H with VSI Crusher Hard Rock 500T/H with VSI Crusher Hard Rock 800T/H with VSI Crusher Hard Rock 1000-1200T/H with VSI Crusher Hard Rock 1500T/H with VSI Crusher Hard Rock 2000T/H with VSI Crusher Hard Rock 100-200T/H Hard Rock 300T/H
Medium Hard Rock: Medium Hard Rock 100T/H Medium Hard Rock 300T/H Medium Hard Rock 500T/H Medium Hard Rock 800T/H Medium Hard Rock 1000-1200T/H Medium Hard Rock 1500T/H Medium Hard Rock 2000T/H
Soft Rock: Soft Rock 100T/H Soft Rock 200T/H Soft Rock 300T/H Soft Rock 500T/H Soft Rock 800T/H Soft Rock 1000-1200T/H Soft Rock 1500T/H Soft Rock 2000T/H